Mar 12 – 14, 2024
SLAC
America/Los_Angeles timezone

Session

New Detector Tech / Skippers - 2

Mar 14, 2024, 10:55 AM
48/1-112C/D - Redwood C/D (SLAC)

48/1-112C/D - Redwood C/D

SLAC

2575 Sand Hill Rd Bldg. 048 Menlo Park, CA 94025
45

Presentation materials

There are no materials yet.

  1. Alex Drlica-Wagner (Fermi National Accelerator Laboratory/University of Chicago), Edgar Marrufo (University of Chicago)
    3/14/24, 10:55 AM
    New Detector Technologies
    Oral presentation (20 minute)

    Ultra-low readout noise detectors will enable increased sensitivity to high-density and high-redshift spectroscopic surveys to place tighter constraints on dark energy and dark matter (e.g., a Stage-5 Spectroscopic Survey). We present advances towardplans for demonstrating the performance of an ultra-low noise Skipper CCD focal plane prototype for the SOAR Integral Field Spectrograph (SIFS)...

    Go to contribution page
  2. Ana Martina Botti (FNAL)
    3/14/24, 11:20 AM
    New Detector Technologies
    Oral presentation (20 minute)

    The partial charge collection (PCC) layer is a transition interface between the back-end SiO2 (or SiO2 + ZrO2 + In) death layer and the high-purity Silicon bulk in a CCD. Due to the increased likelihood of re-absorption of electron-hole pairs in this region, the charge collection efficiency is typically below that in the bulk. This layer has a large impact on the efficiency loss of the optical...

    Go to contribution page
  3. Bernard Rauscher (NASA Goddard Space Flight Center)
    3/14/24, 11:45 AM
    New Detector Technologies
    Oral presentation (20 minute)

    The 2020 Decadal Survey of Astronomy and Astrophysics (Astro2020) recommended technology development for a large, 6-m class, infrared/optical/ultraviolet space telescope as its highest priority for strategic space missions. The search for evidence of life on other worlds using spectroscopic biosignatures is a key science aim. Many important biosignatures; including H$_2$O and O$_2$, are strong...

    Go to contribution page
  4. 3/14/24, 12:10 PM
Building timetable...