15–19 May 2023
America/Los_Angeles timezone

APS cavity study

17 May 2023, 14:30
10m
51/3-305 - Kavli 3rd Floor (SLAC)

51/3-305 - Kavli 3rd Floor

SLAC

48
Oral Particle Sources Accelerator: Particle Sources

Speakers

Hitoshi Hayano (KEK)Dr M Fukuda (KEK)

Description

APS cavity is designed for the capture linac of E-Driven positron source. In addition to the RF load, a large heat load by the beam is expected. The experiment to simulating the detuning is being carried out at Iwate ILC lab. The status will be reported.

Primary authors

Presentation materials