7–11 Oct 2024
SLAC
America/Los_Angeles timezone

ALS-U Accumulator Ring Alignment progress

T33
11 Oct 2024, 11:25
25m
51/1-102 - Kavli Auditorium (SLAC)

51/1-102 - Kavli Auditorium

SLAC

150

Speaker

Hongyan Zhu (Lawrence Berkeley National Lab)

Description

The ALS-U project is upgrading the existing Lawrence Berkeley National Laboratory Advanced Light Source to a diffraction-limited soft x-ray light source. There will be two accelerators residing in the existing tunnel, the Accumulator Ring (AR) and the Storage Ring (SR). AR pre-staging (assembly of magnets on rafts) and their installation in the tunnel are currently taking place. This talk will cover the pre-staging alignment budget breakdown and the survey and alignment work progress.

Author

Hongyan Zhu (Lawrence Berkeley National Lab)

Co-authors

Bertrand Nicquevert (Ecole Normale Supérieure de Paris Saclay (+ LBNL + CERN on special leave)) Katherine Ray (Lawrence Berkeley National Lab)

Presentation materials