Conveners
Survey Concepts and strategy II
- William Jansma (Argonne National Laboratory)
Hefei Advanced Light Facility (HALF), a key mega-science facility, has started civil construction since June 2023 in Hefei, China, and National Synchrotron Radiation Laboratory (NSRL) is responsible for the construction. HALF is a 4th generation diffraction limited synchrotron radiation light source which includes a 192 m injector, a 138.4 m transport line, and a storage ring with a...
Research laboratory engineering departments encourage employees to pursue professional development in their field. Within the accelerator alignment community, limited introductory resources address the unique considerations of this specialized discipline. This paper aims to cover important alignment concepts in an engaging and exploratory manner utilizing a multiple-choice quiz format to help...
The accurate placement of magnets is essential for accurate magnetic field measurements. The current positioning technique employed for harmonic coil measurement is inefficient due to its labor-intensive and time-consuming nature. Therefore, we use four cameras to monitor the position of the magnet due to its non-contact feature, and an electrically driven Stewart platform is utilized to...